首页> 外文期刊>电气(英文版) >Service Power Rate and Electricity-Saving in Conventional Thermal Power Plants
【24h】

Service Power Rate and Electricity-Saving in Conventional Thermal Power Plants

机译:传统火力发电厂的服务电价和节电

获取原文
获取原文并翻译 | 示例
       

摘要

@@ Since reforming and opening to the outside world, the power construction in China has been expanding by leaps and bounds. As of the end of 2005, the nationwide generation installed capacity made a breakthrough of 500 GW, of which thermal power units represented three-fourths.Relevant predictions indicate that the installed capacity will reach 680-730 GW in 2010 and it will exceed 1000 GW in 2020 as expected. The present situation of service power rate of thermal power units and how to make it approach and come up to world level are questions to be discussed in this paper.
机译:@@以来改革开放到外界,中国的电力建设一直在扩大突飞猛进。截至2005年底,全国一代已安装的容量取得了500 GW的突破,其中火电机为三分之三表示.LELEVANT预测表明,2010年安装的容量将达到680-730 GW,它将超过1000 GW在2020年预期。热电部队服务电力率的现状及如何使其方法达到世界范围是本文的问题。

著录项

  • 来源
    《电气(英文版)》 |2006年第4期|26-30|共5页
  • 作者

  • 作者单位

    无;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号