The aim of this paper is to select the best location for the construction of a dry port in Niger which is a land locked country (LLC). Niger is located in the Sahel and has a land area of 1,267,000 square kilometers [1], with the closest port being port of Cotonou in Benin. The transport corridor from Niamey to Cotonou is approximately 1036 km long [2]. It is estimated that this corridor carries about 40 percent of Niger’s overseas trade traffic [3]. In this work, the Analytic Network Process (ANP) model is used to determine the optimal location of the dry port, among three major cities: Niamey (capital city), Dosso and Gaya. From the application of this selection model, Dosso was selected as the best location for the location of the dry port, while Gaya and Niamey were placed second and third respectively. The results obtained in this work strongly confirm the decision of the government of Niger to construct a dry port in Dosso, a project that commenced in 2010 and is still in progress.
展开▼
机译:Geo-radar scanning and GIS mapping of an old water utility network in Paphos District area in Cyprus under the project: 'Upgrade of the hydraulics laboratory for the modeling of water supply networks design and operation optimization study'
机译:Preference for effectiveness factors in the appropriate selection of microtúnel drilling machines (MTBM) using the focus of the diffuse analytical hierarchical process (Fach)