首页> 外文期刊>矿物质和材料特性和工程(英文) >Assessment of Relationship of Some Causal Factors Associated with Productivity of Longwall Mining Using Structured Equation Modeling
【24h】

Assessment of Relationship of Some Causal Factors Associated with Productivity of Longwall Mining Using Structured Equation Modeling

机译:Assessment of Relationship of Some Causal Factors Associated with Productivity of Longwall Mining Using Structured Equation Modeling

获取原文
获取原文并翻译 | 示例
       

摘要

Enhancement of productivity optimization is steadily gaining the priority in mining companies especially in the underground coal mining industry which faces a daunting task to balance marginal profit generation with a comparatively high cost of production, volatile market price and rapid grade variation. This paper is aimed to analyze some of the causal factors both technical and site specific which are directly or indirectly impacting the productivity of the longwall coal mining system such as downtime of equipment system in longwall panel, overloading of conveyors and bin, preventive maintenance, gas management practices and injury severity rate. Structured Equation Modelling (SEM) was used to study the causal relationships between the above-mentioned factors and mine productivity. The equipment considered for analysis included shearer, armored face conveyor, crusher, bridge stage loader, chock supports, main gate drive, gate conveyor, hydraulic pumps and crusher. SEM was applied to relate the correlations existing among these causal variables in order to assess their direct or indirect impact on mining productivity. Based on the data extracted over a period of 10 months which included the extraction of 2 longwall panels, the study revealed a significant negative causal relationship between injury severity rate (p < 0.01) and equipment downtime (p = 0.001), with mine productivity. However, preventive maintenance delay time, gas management delay time and conveyor overloading delay time were found to have an insignificant direct influence on mine productivity but indirectly modify it through a significant mediator relationship with equipment downtime. This information would assist mine management to take proper preventive measures.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号