通过对2013施工合同示范文本等相关条款的梳理和分析,指出承包人应对异常恶劣气候条件下的停工损失进行索赔,并就承发包双方在签订合同时如何避免出现此类纠纷提出应对策略。%Through summarizing and analyzing relevant regulations including 2013 version of the construction contract model text,this paper points out contractors should claim for loss on cessation due to exceptionally adverse climatic conditions,and puts forward suggestions to avoid similar disputes when signing the contract for both contractors and owners.
展开▼