竣工结算阶段总承包服务费的调整分析

         

摘要

In order to solve the dispute of general contracting service fee in thefinal completion budget stage, this paper summaries and analyzes the calculation method and problems of general contracting service fee based on 2013 bill code,analyzes the risk responsibility which should be respectively shared by the main contractor and the professional subcontractor in the process of the professional subcontract project,and puts forward reasonable adjust calculation methods for general contracting service fee with the cases of engineering quantity increase or prolonged construction period which caused by the contracting party or the professional subcontractors. Finally, combined with the practical engineering case,verifies the feasibility of the adjust calculation methods,in order to provide references for the settlement disputes of general contracting service fee.%为解决总承包服务费竣工结算纠纷,基于13清单规范归纳分析总承包服务费的计算方法及存在的问题,分析发包方和专业分包方在专业分包工程实施中应承当的风险责任,并对发包方原因或专业分包方原因引起的总承包服务工程量增加或工期延长情况,提出合理的总承包服务费调整计算方法.最后,结合具体案例工程,对所提计算方法的适用性进行验证,为解决总承包服务费结算纠纷提供参考.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号