首页> 中文期刊> 《煤田地质与勘探》 >水泥-水玻璃双液注浆三阶段加固模型及其应用

水泥-水玻璃双液注浆三阶段加固模型及其应用

         

摘要

根据在郴州地区对残坡积土进行水泥–水玻璃双液注浆工程的实践,建立了水泥–水玻璃双液注浆加固残坡积土的三阶段模型,即初级加固阶段、径向压密加固阶段和成桩–顶升阶段,同时分析了适合这三个阶段的理论公式。阐述了水泥–水玻璃双液注浆加固土体的机理。根据双液注浆加固工程实例的监测数据分析注浆的过程,结果表明,注浆过程与本文建立的三阶段注浆模型基本吻合。%Based on the practice of cement-waterglass grouting engineering, three-stage model of cement- water-glass grouting for residual soil was established in this paper, and the appropriate formulas for those stages were analyzed. The three stages are the primary strengthening stage, the radial compacting stage, the pile-forming and jacking stage. After that, the strengthening mechanism of cement-waterglass grouting was also elaborated. At last, combined with the monitoring data of a specific cement-waterglass grouting project, the grouting process was ana-lyzed. The result shows that the grouting process shows little difference from the three-stage model established in this paper.

著录项

  • 来源
    《煤田地质与勘探》 |2015年第2期|73-7682|共5页
  • 作者单位

    中南大学地球科学与信息物理学院;

    有色资源与地质灾害探查湖南省重点实验室;

    湖南 长沙 410083;

    中南大学地球科学与信息物理学院;

    有色资源与地质灾害探查湖南省重点实验室;

    湖南 长沙 410083;

    中南大学地球科学与信息物理学院;

    有色资源与地质灾害探查湖南省重点实验室;

    湖南 长沙 410083;

    中南大学地球科学与信息物理学院;

    有色资源与地质灾害探查湖南省重点实验室;

    湖南 长沙 410083;

    中南大学地球科学与信息物理学院;

    有色资源与地质灾害探查湖南省重点实验室;

    湖南 长沙 410083;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 土质改良学;
  • 关键词

    双液注浆; 残坡积土; 三阶段模型; 加固机理;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号