This is a status report of the project on befalf of the BEPC Ⅱ team.BEPC Ⅱ is a major upgrade radiation(SR)source with its outer ring,or SR ring.As a collider,BEPC Ⅱ operates in the beam energy region of 1-2.3 GeV with design luminosity of 1×1033 cm-2s-1 at 1.89 GeV.As a light source.the SR ring operates at 2.5 GeV and 250 mA.Construction of the project started in the beginning of 2004.Installation of the storage ring components was completed in October 2007.Commissioning is in progress.There are still many issues for further studies before reach to 3×1032 cm-2s-1.