首页> 中文期刊> 《中国地质(英文)》 >The second natural gas hydrate production test in the South China Sea

The second natural gas hydrate production test in the South China Sea

         

摘要

Clayey silt reservoirs bearing natural gas hydrates(NGH)are considered to be the hydrate-bearing reservoirs that boast the highest reserves but tend to be the most difficult to exploit.They are proved to be exploitable by the first NGH production test conducted in the South China Sea in 2017.Based on the understanding of the first production test,the China Geological Survey determined the optimal target NGH reservoirs for production test and conducted a detailed assessment,numerical and experimental simulation,and onshore testing of the reservoirs.After that,it conducted the second offshore NGH production test in 1225 m deep Shenhu Area,South China Sea(also referred to as the second production test)from October 2019 to April 2020.During the second production test,a series of technical challenges of drilling horizontal wells in shallow soft strata in deep sea were met,including wellhead stability,directional drilling of a horizontal well,reservoir stimulation and sand control,and accurate depressurization.As a result,30 days of continuous gas production was achieved,with a cumulative gas production of 86.14×104 m3.Thus,the average daily gas production is 2.87×10^4 m^3,which is 5.57 times as much as that obtained in the first production test.Therefore,both the cumulative gas production and the daily gas production were highly improved compared to the first production test.As indicated by the monitoring results of the second production test,there was no anomaly in methane content in the seafloor,seawater,and atmosphere throughout the whole production test.This successful production test further indicates that safe and effective NGH exploitation is feasible in clayey silt NGH reservoirs.The industrialization of hydrates consists of five stages in general,namely theoretical research and simulation experiments,exploratory production test,experimental production test,productive production test,and commercial production.The second production test serves as an important step from the exploratory production test to experimental production test.

著录项

  • 来源
    《中国地质(英文)》 |2020年第2期|P.197-209|共13页
  • 作者单位

    China Geological Survey Ministry of Natural Resources Beijing 100037 ChinaGuangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 ChinaInstitute of Exploration Techniques China Geological Survey Ministry of Natural Resources Langfang 065000 China;

    China Geological Survey Ministry of Natural Resources Beijing 100037 ChinaGuangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 ChinaSouthern Marine Science and Engineering Guangdong Laboratory(Guangzhou) Guangzhou 510000 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 ChinaInstitute of Exploration Techniques China Geological Survey Ministry of Natural Resources Langfang 065000 China;

    Peking University Beijing 100871 China;

    CNPC Offshore Engineering Company Limited Beijing 100102 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Oil and Gas Resources Survey China Geological Survey Ministry of Natural Resources Beijing 100083 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    CNPC Offshore Engineering Company Limited Beijing 100102 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Institute of Exploration Techniques China Geological Survey Ministry of Natural Resources Langfang 065000 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Institute of Exploration Techniques China Geological Survey Ministry of Natural Resources Langfang 065000 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    CNPC Offshore Engineering Company Limited Beijing 100102 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

    Guangzhou Marine Geological Survey China Geological Survey Ministry of Natural Resources Guangzhou 510075 China;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 中国工业经济;
  • 关键词

    Natural gas hydrates; Second production test; Horizontal well; Reservoir stimulation; Environmental impact; NGH exploration trial engineering; South China Sea;

    机译:天然气水合物;二次生产测试;水平井;储层增产;环境影响;NGH勘探试验工程;南海;
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号