目前我国水电站冲击式水轮机正向着大容量、多喷嘴的方向发展,为适应发展需要,冲击式水轮机组调速器应运而生。本文重点对水电站冲击式水轮机组调速器技术发展历程进行探讨。%At present,pelton turbine of hydropower station is designed to the direction of large-capacity and multi-nozzle in China.Pelton turbine unit speed governor is produced as a result in order to meet development needs.In the paper, technical development process of hydropower station pelton turbine speed governor are mainly discussed in the paper.
展开▼