首页> 外文期刊>中国铁路(英文版) >Optimized System Design to Ensure Safe and Smooth Operation
【24h】

Optimized System Design to Ensure Safe and Smooth Operation

机译:优化的系统设计可确保安全平稳地运行

获取原文
获取原文并翻译 | 示例
       

摘要

After the replacement with automatic system for the down direction hump of Zhengzhou North Station, some problems occurred in the sub-system of the speed control of the TW-2 hump automatic system and the sub-system of the sorting interlocking, such as poor control accuracy, complicated operation, too long time for mode switch of different performances etc. had made it impossible to meet the physical requirements of the sorting performance of the station, having an adverse effect on the safety and efficiency of the hump. Through intensive analysis on both external and internal causes, some counter measures had been put forward to solve the problems and some validations were carried out on the site. Therefore the aims to ensure safe and reliable operation of the station were reached.
机译:用自动系统进行郑州北站下方向驼峰后,对TW-2驼峰自动系统的速度控制和分拣互锁子系统的速度控制发生了一些问题,如差的控制精确,复杂的操作,不同性能等的模式切换的时间很长。已经无法满足车站排序性能的物理要求,对驼峰的安全性和效率产生不利影响。通过对外部和内部原因的密集分析,已经提出了一些反措施来解决问题,在网站上进行了一些验证。因此,旨在确保站的安全可靠运行。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号