首页> 外文期刊>中国原子能科学研究院年报:英文版 >Installation and Debugging of Energy Measuring Equipment of 100 MeV Cyclotron
【24h】

Installation and Debugging of Energy Measuring Equipment of 100 MeV Cyclotron

机译:100 MeV回旋加速器电能测量设备的安装与调试

获取原文
获取原文并翻译 | 示例
       
机译:In order to measure the energy of the 100 MeV cyclotron to actually output the proton beam,the water phantom dosimetry system(Hereinafter referred to as water tank)produced by Physikalisch-Technische Werksttten(PTW)is adopted by Cyclotron research and design center.We use the tank to measure the depth dose curve of the

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号