摘要

In order to develop high performance fuel assembly for domestic nuclear power plant, it is necessary to master some fundamental test technology. So the research on the power ramp testing methods is proposed. A tentative power ramp test for short PWR fuel rod has been conducted at the heavy water research reactor (HWRR) in China Institute of Atomic Energy (CIAE) in May of 2001. The in-pile test rig was placed into the central channel of the reactor . The test rig consists of pressure pipe assembly, thimble, solid neutron absorbing screen and its driving parts, etc.. The test
机译:为了开发用于家用核电站的高性能燃料组件,有必要掌握一些基本的测试技术。因此提出了功率斜坡测试方法的研究。 2001年5月,在中国原子能研究院(CIAE)的重水研究反应堆(HWRR)上进行了短压水堆燃料棒的初步功率斜升试验。该桩内试验台被放置在该反应堆的中央通道中。反应堆。试验台由压力管组件,顶针,固体中子吸收滤网及其驱动部件等组成。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号