The tested fuel assembly for In-pile test for PWR fuel element with instrumentation consisted of 4instrumented fuel elements and total 12 sets of transducers. Double claddings are adopted to raise fueltemperature. Two fuel elements each have 2 thermocouples for measuring separately the fuel centerlinetemperature and the cladding surface temperature. The other two elements have membrane type oressure
展开▼