首页> 中文期刊> 《中国原子能科学研究院年报:英文版》 >Commissioning Progress of JCNS-CIAE Thermal Neutron Triple-axis Spectrometer

Commissioning Progress of JCNS-CIAE Thermal Neutron Triple-axis Spectrometer

         

摘要

<正>The JCNS-CIAE triple-axis spectrometer(TAS)was designed and constructed by Juelich Neutron Center(JCNS).It was relocated to China Institute of Atomic Energy(CIAE)in2009.As the first inelastic neutron scattering spectrometer cooperating between CIAE and foreign institute,the re-installation and commission had drew much attention of the German

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号