This paper, on the basis of relevant test data, explores the rationality of power supply plan for standby lighting in fire fighting equipment room from the aspects of power supply continuity of standby lighting distribution line, short circuit protection sensitivity of end line, equipment room maintenance and power supply reliability, and suggests that standby lighting in equipment room is supplied with power from ATSE double power switch box in the room.%结合相关试验数据,从备用照明配电线路的供电连续性、末端线路短路保护灵敏度校验、设备机房检修、供电可靠性等方面探讨消防设备机房内部备用照明供电方案的合理性,建议消防设备机房内备用照明从机房内已设置的ATSE双电源切换箱后取得电源。
展开▼