In this article,the operation status of BEPC/BSRF in 1999/2000 is mainly reviewed.BEPR is designed to serve as a research facility for both elementary particle physics and synchrotron radiation experiments.There were three major tasks for accelerator during this operation:Provide beams to BSRF for about 70 days which were distributed into three periods.operate for high energy physics experiments at 1.55 GeV to acquire more than 20 million J/ψ events.and finish the preliminarily machine studies which are relative to BEPC further upgrades and BEPC-II project studies.With the collaborative efforts of all the accelerator people,all the goals were achieved successfully at last.