首页> 中文期刊> 《宝钢技术研究:英文版》 >On-site raw gas cut-off during the shut down of Baosteel phaseⅠcoke ovens

On-site raw gas cut-off during the shut down of Baosteel phaseⅠcoke ovens

         

摘要

The preparation and implementation of rawcoke oven gas cut-off,which was the key process involved with shutting down the Baosteel phase I coke ovens,were investigated,and the main technical points and countermeasures are presented.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号