This paper mainly selects and optimizes the installation of the national speed skating roof truss installation from the qualitative and quantitative aspects, such as hoisting outside the venue, hoisting in the stadium, and high-altitude sliding. According to the comparison and optimization results, the national speed skating hall is proposed. The final overall construction plan for the roof ring truss installation is expected to provide a reference for similar construction.%主要从定性和定量两方面对国家速滑馆屋面环桁架安装工程进行了场馆外吊装、场馆内吊装、高空滑移等方案的比选和优化, 根据比选和优化结果提出国家速滑馆屋面环桁架安装最终的总体施工方案, 可对类似工程施工提供参考.
展开▼