首页> 中文期刊> 《中国航天:英文版》 >LM-4C Completed Dual Strap-down Test on the Simulated System

LM-4C Completed Dual Strap-down Test on the Simulated System

         

摘要

The Shanghai Spaceflight Equipment Manufacturing General Factory of SAST conducted a simulated system dual strap-down test on the third stage of the LM-4C launch vehicle.The Factory adopted double strapdown redundancy arrangement for

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号