首页> 外文学位 >Joint inspection and inventory models for k-out-of-n systems.
【24h】

Joint inspection and inventory models for k-out-of-n systems.

机译:n出n的系统的联合检查和库存模型。

获取原文
获取原文并翻译 | 示例

摘要

The objective is to study the relationship between maintenance and inventory for a k-out-of-n system. The component's failures are hidden and follow a non-homogeneous Poisson process. Two types of inspections are performed to reveal the failed components: periodic inspections and opportunistic inspections which are performed at system failure times (when n -- k + 1 components are down at once). The failed components are, depending on their state, either minimally repaired or replaced with spare parts from the inventory. Our goal is to find the inspection frequency and the inventory replenishment policy such that the total cost is minimized over a finite planning horizon. Two models are considered. First we will assume that the periodic inspections and the inventory replenishments are performed simultaneously. Then we will relax this assumption and allow independent inspections and inventory reviews. A simulation model is developed and heuristic search methods are used to find the optimal solution.
机译:目的是研究k-out-of-n系统的维护与库存之间的关系。组件的故障是隐藏的,并且遵循不均匀的泊松过程。进行两种类型的检查以发现失败的组件:定期检查和机会检查,它们是在系统出现故障时执行的(当n-k + 1个组件一次停机时)。根据其状态,对故障的组件进行最少的维修,或者用库存中的备件替换。我们的目标是找到检查频率和库存补充策略,以使总成本在有限的计划范围内最小化。考虑两个模型。首先,我们假设定期检查和库存补充是同时进行的。然后,我们将放宽此假设,并允许独立检查和库存审查。建立了仿真模型,并使用启发式搜索方法找到最佳解决方案。

著录项

  • 作者单位

    University of Toronto (Canada).;

  • 授予单位 University of Toronto (Canada).;
  • 学科 Engineering Industrial.;Operations Research.
  • 学位 M.A.S.
  • 年度 2014
  • 页码 159 p.
  • 总页数 159
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:54:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号