首页> 外文学位 >Resource recovery facilities: Production and cost functions, and debt financing issues.
【24h】

Resource recovery facilities: Production and cost functions, and debt financing issues.

机译:资源回收设施:生产和成本功能以及债务融资问题。

获取原文
获取原文并翻译 | 示例

摘要

Extreme increases in local expenditures for solid waste disposal have resulted from a dwindling supply of local disposal capability coupled with increasing amounts of trash produced. The increasingly high cost of landfill disposal makes public policy options that reduce the amount of waste to be landfilled attractive. The intent of this dissertation is to move knowledge forward on a limited number of important aspects of the policy process as it relates to trash incineration.; Specifically, the dissertation addresses some of the fiscal questions relating to resource recovery, or trash burning, facilities. Production and cost functions for resource recovery facilities are estimated using regression analysis. Whether or not there are returns to scale are addressed using the production and cost function framework. Production functions are also estimated using data envelopment analysis (DEA), and the results are compared to the regression results. DEA is a linear program based technique that can provide information about the production process. The data used to estimate the production and cost functions were collected from the Resource Recovery Yearbook.; Once the decision is made to construct a resource recovery facility, it needs to be financed. The high cost of these facilities usually prohibits financing construction out of regular operating revenues. Therefore, the dissertation provides an analysis of the issues a government faces when debt is used to finance a resource recovery facility.; The most important public policy finding of this dissertation is that increasing economies of scale do not seem to be present for resource recovery facilities. The absence of increasing returns to scale means that other cost factors relating to the overall solid waste management process may take on more importance. The most appropriate facility size is the one that minimizes overall solid waste costs, which may include recycling, landfill, transportation costs, etc. Since the size of the incinerator does not appear to affect its cost or output, it may be less costing overall to have a number of smaller strategically located facilities rather than one big facility in order to save on transportation costs.
机译:本地废物处理能力的供应减少,加上产生的垃圾量增加,导致当地用于固体废物处理的支出急剧增加。垃圾填埋场处置成本的日益高涨,使得减少垃圾掩埋场数量的公共政策选择具有吸引力。本文的目的是在与垃圾焚烧有关的政策过程的有限的重要方面推动知识的发展。具体而言,本文解决了与资源回收或垃圾焚烧设施有关的一些财政问题。使用回归分析估算资源回收设施的生产和成本函数。使用生产和成本函数框架解决是否有规模收益。还使用数据包络分析(DEA)估算生产函数,并将结果与​​回归结果进行比较。 DEA是基于线性程序的技术,可以提供有关生产过程的信息。从资源回收年鉴中收集了用于估计生产和成本函数的数据。一旦决定构建资源回收设施,就需要为其提供资金。这些设施的高昂费用通常禁止从正常营业收入中筹集建设资金。因此,本文分析了政府在利用债务为资源回收设施融资时面临的问题。本论文最重要的公共政策发现是资源回收设施似乎不存在规模经济增长的问题。缺乏规模收益的增加意味着与整体固体废物管理过程有关的其他成本因素可能会变得更加重要。最合适的设施规模应是使总体固体废物成本(包括回收,垃圾掩埋,运输成本等)最小化。由于焚化炉的大小似乎不会影响其成本或产量,因此总体上降低了成本为了节省运输成本,在战略位置上设有一些较小的设施,而不是一个大型设施。

著录项

  • 作者

    Simonsen, William Steven.;

  • 作者单位

    New York University.;

  • 授予单位 New York University.;
  • 学科 Political Science Public Administration.; Environmental Sciences.
  • 学位 Ph.D.
  • 年度 1991
  • 页码 233 p.
  • 总页数 233
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 政治理论;环境科学基础理论;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号