首页> 外文学位 >Time-dependent analysis of pretensioned concrete bridge girders.
【24h】

Time-dependent analysis of pretensioned concrete bridge girders.

机译:预应力混凝土桥梁大梁的时变分析。

获取原文
获取原文并翻译 | 示例

摘要

The increasing use of high strength concrete in pretensioned concrete bridge girders drove the development of new prestress loss provisions that were introduced to the AASHTO LRFD Bridge Design Specifications in 2005. The provisions have led to industry concerns because of the complex implementation of the equations and seemingly unconservative results. The research documented in this thesis studies the models used historically for prestress loss analysis in bridge girders, then proposes a simplified method for design. The simplified method is derived from fundamental principles of mechanics and validated by comparison with a detailed time step analysis. Monte Carlo simulation is used to consider the inherent uncertainty in time-dependent analysis of concrete girders. The simplified approach, called the Direct Method, is formatted for inclusion in the AASHTO LRFD Bridge Design Specifications.
机译:预应力混凝土桥梁梁中高强度混凝土的使用不断增加,推动了新的预应力损失规定的制定,该规定已于2005年引入AASHTO LRFD桥梁设计规范中。由于方程的复杂实施以及表面上看来,这些规定引起了业界的关注。不保守的结果。本文所进行的研究研究了过去用于桥梁大梁预应力损失分析的模型,然后提出了一种简化的设计方法。简化方法从力学的基本原理派生出来,并通过与详细的时间步分析进行比较而得到验证。蒙特卡罗模拟用于在混凝土梁的时变分析中考虑固有的不确定性。简化的方法称为直接方法,其格式设置为包含在AASHTO LRFD桥梁设计规范中。

著录项

  • 作者

    Swartz, Brian D.;

  • 作者单位

    The Pennsylvania State University.;

  • 授予单位 The Pennsylvania State University.;
  • 学科 Engineering Civil.
  • 学位 Ph.D.
  • 年度 2010
  • 页码 232 p.
  • 总页数 232
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号