Effective software cost estimation is one of the most challenging and important activities in software development. The software industry does not estimate projects well. Poor estimation leads to poor project planning with resulting schedule overruns, inadequate staffing, low system quality, and many aborted projects. Research on software estimation is needed to build more accurate models of the key aspects of software development. The goals of research in this dissertation are to investigate and improve the modeling of team size and project structures in current software estimation methods.;Mathematical models for estimating the impacts of project team size and three variations of project structure are developed. These models accept the outputs of the COCOMO II software estimation tool, allow variation in both team size and project structure, and produce more detailed project estimates. This new extended model of COCOMO II is implemented in a decision support tool for software estimators called PSEstimate.;Following the design science research paradigm, the artifact is evaluated with an experiment with experienced software project managers. Three treatment groups: a manual (no tool) group, a COCOMO II group, and a PSEstimate group, completed two multipart software cost estimation tasks. The accuracy and consistency of the cost and schedule estimates, the participants' confidence in their estimates, and their satisfaction with and perceived usefulness of the cost estimation tool are measured.;The experimental results support most of the hypotheses of the dissertation. For most tasks, individuals aided by computer-based decision support tools produce more accurate project effort estimates and are more confident in their estimates than manual estimators. There are no significant differences between the three groups on schedule estimation. A possible explanation is that experienced estimators in the manual group compensate for the inaccuracy of their effort estimates by adding time to their schedule estimates.;The research contributions are new mathematical models for software estimation based on project team size and structure; a decision support tool (PSEstimate) that incorporates these models; and the experimental results that demonstrate improvements in software estimation by experienced project managers when the new models and tool are applied in practice.
机译:有效的软件成本估算是软件开发中最具挑战性和重要的活动之一。软件行业对项目的估计并不理想。估算不佳会导致项目计划不佳,从而导致进度超支,人员不足,系统质量低下以及许多中止的项目。需要进行软件估计研究,以建立软件开发关键方面的更准确模型。本文的研究目的是研究和改进现有软件评估方法中团队规模和项目结构的建模。;建立了估算项目团队规模影响的数学模型以及项目结构的三种变化。这些模型接受COCOMO II软件估算工具的输出,允许团队规模和项目结构的变化,并产生更详细的项目估算。 COCOMO II的这种新扩展模型在称为PSEstimate的软件估计器的决策支持工具中实现。按照设计科学研究的范式,由经验丰富的软件项目经理通过实验对工件进行评估。三个治疗组:一个手动(无工具)组,一个COCOMO II组和一个PSEstimate组,完成了两个多部分的软件成本估算任务。测量了成本和进度估算的准确性和一致性,参与者对估算的信心以及对成本估算工具的满意度和感知的实用性。实验结果支持了本文的大多数假设。对于大多数任务,在基于计算机的决策支持工具的帮助下,个人可以比手动估算器更准确地估算项目工作量,并对估算值更有信心。时间表估计这三组之间没有显着差异。可能的解释是,人工小组中经验丰富的估算人员会通过在进度估算中增加时间来弥补其工作估算的不准确性。研究成果是基于项目团队规模和结构进行软件估算的新数学模型;包含这些模型的决策支持工具(PSEstimate);实验结果证明了有经验的项目经理在实际应用新模型和工具后在软件评估方面的改进。

著录项

  • 作者

    Douglas, Michael Jay.;

  • 作者单位

    University of South Florida.;

  • 授予单位 University of South Florida.;
  • 学科 Business Administration Management.;Computer Science.
  • 学位 Ph.D.
  • 年度 2006
  • 页码 200 p.
  • 总页数 200
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号