1绪论
1.1 选题背景(Background)
1.2 国内外研究现状(Research Status at Home and Abroad)
1.3 存在的主要问题(Main Problem)
1.4主要内容、研究方法与技术路线(Main Content, Research Methods and Technical Routes)
2工作面基本概况
2.1 工作面基本情况(Basic Overview of the Work Surface)
2.2地质构造情况(Geological Structure)
2.3煤层及煤质情况(Coal Seam and Coal Quality)
2.4工作面水文地质情况(Working Surface Hydrogeology)
2.5本章小结(The summary of this chapter)
3研究区陷落柱形成机制的探讨
3.1 探查基本情况(Exploring the Basic Situation)
3.2 出水范围与原因分析(Outlet Range and Cause Analysis)
3.3 19109陷落柱发育机制(19109 Collapse Column Development Mechanism)
3.4本章小结(The summary of this chapter)
4 19109注浆加固治理设计方案
4.1 工作面煤层底板探查(Principles and Basis for Compilation)
4.2注浆孔设计方案(Coal Seam Floor Exploration and Grouting Drilling Design)
4.3煤层底板注浆加固治理设计方案(Design Scheme of Grouting Reinforcement Treatment for Coal Seam Floor)
4.4 施工要求(Construction Technical Requirements)
4.5本章小结(The summary of this chapter)
5 注浆封堵的机理研究
5.1不同浆液流动与封堵机理(Different Slurry Flow and Plugging Mechanism)
5.2 工程施工(Engineering Construction)
5.3本章小结(The summary of this chapter)
6现场注浆效果及评价
6.1验证孔设计(Inspection Drilling Design)
6.2验证孔结果分析(Inspection Drilling Results Analysis)
6.3本章小结(The summary of this chapter)
7结论
7.1残余水量分析(Residual Water Analysis)
7.2总体评价(Overall Evaluation)
参考文献
作者简介
学位论文数据集