首页> 外文会议>WEFTEC 2012;Water Environment Federation annual technical exhibition and conference >WebPM: East Bay Municipal Utility District’s Innovative Software That Closely Tracks Projects and Assets and Saves Money
【24h】

WebPM: East Bay Municipal Utility District’s Innovative Software That Closely Tracks Projects and Assets and Saves Money

机译:WebPM:东湾市政公用事业区的创新软件,可以密切跟踪项目和资产并节省资金

获取原文

摘要

The East Bay Municipal Utility District (EBMUD) developed their own project managementsoftware (named: WebPM) that automatically updates project information in graphs and tablesfrom EBMUD’s financial information system (FIS) to make it easy for project managers andothers to closely track project budgets and schedules, and better oversee and manage projects toavoid cost overruns and schedule delays. Project graphics include well established “S-Curves,“which are automatically constructed and updated, that trend the budgeted cost of work performed(BCWP—actual work done) with planned costs (work actually performed per the project’sbudget and schedule), and the actual project cost to allow the project manager to more easily seewhen a project is starting to slip or is progressing as planned. WebPM also provides the projectmanager easy access, with graphics and tables, to individual project costs to more easily identifywhy cost overruns occured. From individual project information, WebPM can monitor anunlimited number of projects and provide manangement reports that list which projects are aheador behind their budgets and/or schedules. This information can automatically be emailed tothose interested. Recently, EBMUD added an asset tracking feature to WebPM so that asset costcould be more easily tracked, and useful service life for the asset might be better estimated.
机译:东湾市政公用事业区(EBMUD)开发了他们自己的项目管理软件(名为:WebPM),该软件自动从EBMUD的财务信息系统(FIS)中更新图形和表格中的项目信息,从而使项目经理和其他人可以轻松地密切跟踪项目预算和进度,并更好地监督和管理项目,以避免成本超支和进度延误。项目图形包括完善的“ S曲线”,它们会自动构建和更新,从而使预算的已完成工作成本(BCWP-实际完成的工作)与计划的成本(根据项目预算和进度实际执行的工作)趋于一致,实际项目成本,以便项目经理可以更轻松地了解项目何时开始下滑或按计划进行。 WebPM还通过图形和表格为项目经理提供了易于访问的图形和表格,可以更轻松地确定成本超支的原因。 WebPM可以从单个项目信息中监视无限数量的项目,并提供管理报告,列出哪些项目在其预算和/或进度表之后。此信息可以自动通过电子邮件发送给感兴趣的人。最近,EBMUD在WebPM中添加了资产跟踪功能,以便可以更轻松地跟踪资产成本,并且可以更好地估计资产的使用寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号