首页> 外文会议>Water Environment Federation 76th annual technical exhibition and conference (WEFTEC 2003) >BNR RATING OF THE ARLINGTON COUNTY WATER POLLUTION CONTROL PLANT THROUGH FULL-SCALE TESTING AND CALIBRATED MODELING
【24h】

BNR RATING OF THE ARLINGTON COUNTY WATER POLLUTION CONTROL PLANT THROUGH FULL-SCALE TESTING AND CALIBRATED MODELING

机译:通过全面测试和标定模型对阿灵顿县水污染控制厂的BNR评级

获取原文
获取原文并翻译 | 示例

摘要

The Arlington County Water Pollution Control Plant (ACWPCP) is a tertiary treatment plant currently rated at 30 mgd, designed to meet monthly average discharge standards of CBOD_5 < 5 mg/L, TSS < 6 mg/L and TP < 0.18 mg/L. The plant was recently upgraded to meet a new ammonia standard (NH3-N < 1.0 mg/L NH3-N/L in summer, and NH3-N < 2.0 mg/L in winter). The plant is also required to remove nitrogen (TN < 8mg/L) on a yearly basis and to reduce the number of plant bypasses that occur during wet weather operating conditions. Significant challenges existed in the plant upgrade project; including no redundancy in the Aeration Tank and Secondary Clarifier infrastructure, low available hydraulic head across the site, a constrained site and limited budget. A decision was made to construct a new Primary Effluent Equalization Tank, retrofit the existing Aeration Tanks, construct one additional Aeration Tank and retrofit the Secondary Clarifiers as part of the BNR upgrade. The retrofitted and expanded BNR facility would be tested under normal and stressed operating conditions. Data derived from the full-scale testing would be utilized to calibrate the activated sludge process simulation model, to give a reliable plant rating and determine essential future facilities. The Arlington County WPCP is unique in the sense that it is one of the first multiple-pass, step-feed BNR processes to be constructed in the eastern USA. The practical experience with this plant will be of interest to municipalities considering BNR upgrades to their existing facilities.
机译:阿灵顿县水污染控制厂(ACWPCP)是目前额定为30 mgd的三级处理厂,旨在满足CBOD_5 <5 mg / L,TSS <6 mg / L和TP <0.18 mg / L的每月平均排放标准。该工厂最近进行了升级,以满足新的氨标准(夏季NH3-N <1.0 mg / L NH3-N / L,冬季NH3-N <2.0 mg / L)。还要求工厂每年去除氮(TN <8mg / L),并减少在潮湿天气条件下发生的工厂旁路次数。工厂升级项目中存在重大挑战;包括曝气池和二级澄清池基础设施中没有冗余,整个站点的可用液压压头低,站点受限以及预算有限。作为BNR升级的一部分,已决定建造一个新的主要污水平衡罐,改造现有的曝气池,建造一个额外的曝气池并改造二级澄清池。改造后的BNR设施将在正常和紧张的工作条件下进行测试。从全面测试获得的数据将用于校准活性污泥工艺模拟模型,以提供可靠的工厂评级并确定未来必不可少的设施。阿灵顿县WPCP的独特之处在于它是美国东部最早建造的多通道,分步进料BNR工艺之一。考虑将BNR升级到其现有设施的市政当局将对该工厂的实践经验感兴趣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号