The Florence Landfill is a Superfund site located in Burlington County, New Jersey. The actual refuse area covers 11.7 hectares (29 acres) in roughly an L-shape. The landfill operated from late-1973 through late-1981 as a solid waste disposal facility. Waste fill thickness ranged from 6 meters (20 ft) to 18 meters (59 ft). Environmental concerns at the site were focused on the reported deposition of approximately 86 metric tons of hazardous chemicals. The site was supposedly capped with 0.6 meter (2 ft) of low hydraulic conductivity soil. However, the thickness of the cap varied from less than 0.15 meter (6 inches) in some areas to the required"0.6 meter (2 ft). The Record of Decision for the site included the installation of a multilayer cap. As part of the multilayer cap design investigations, historical data concerning settlement were gathered. Four topographic surveys (information and maps) of the site prior to the remediation were collected. Observed topographic changes were documented, and these values were used to back calculate the compression index of the waste fill materials and the potential settlement under the new cap loading. In 1993, the 2-meter (6 ft) multilayer cap was completed and initial survey measurements were made at 32 locations (permanent monuments) on the landfill surface. Comparisons are made between settlement before the multilayer cap and the settlement experienced since the cap has been placed. The possible effects that geosynthetics may play in reducing the observed settlement are discussed. The historical data prior to remediation and the post remediation surveys provide hard data upon which one can evaluate predictive values against actual settlement.
机译:佛罗伦萨垃圾填埋场是位于新泽西州伯灵顿县的超级基金网站。实际垃圾面积约为L形,占地11.7公顷(29英亩)。该垃圾填埋场从1973年底到1981年底开始作为固体废物处理设施运行。废物填充的厚度范围从6米(20英尺)到18米(59英尺)。现场对环境的关注集中在所报告的约86公吨危险化学品的沉积上。据称该地点被0.6米(2英尺)低水力传导率的土壤所覆盖。但是,瓶盖的厚度从某些区域的不足0.15米(6英寸)到所需的“ 0.6米(2英尺)”不等。现场的决定记录包括安装多层瓶盖。进行了多层盖设计调查,收集了有关沉降的历史数据,并在修复前对场地进行了四次地形调查(信息和地图),记录了观测到的地形变化,并将这些值用于反算废物的压缩指数在1993年,完成了2米(6英尺)多层盖的建造,并在填埋场表面的32个位置(永久纪念物)进行了初步调查测量。讨论了多层盖之前以及放置该盖以来发生的沉降,并讨论了土工合成材料在减少观测沉降中可能发挥的作用d。修复之前的历史数据和修复后的调查提供了可靠的数据,可以根据这些数据评估实际解决方案的预测值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号