首页> 外文会议>Waste management 2004 symposium (WM'04): waste management, energy security and a clean environment >SHATTUCK CHEMICAL SUPERFUND SITE CHALLENGES OF A3/4-Acre MOVABLE CONTAINMENT STRUCTURE AND CHANGING REMEDIAL ACTION OBJECTIVES
【24h】

SHATTUCK CHEMICAL SUPERFUND SITE CHALLENGES OF A3/4-Acre MOVABLE CONTAINMENT STRUCTURE AND CHANGING REMEDIAL ACTION OBJECTIVES

机译:A3 / 4英亩活动式围护结构的沙特克化学超级现场挑战和不断变化的补救措施目标

获取原文
获取原文并翻译 | 示例

摘要

This case study describes technical and operational challenges encountered and solutions developed during implementation of the“second”remedy at the Shattuck Chemical Superfund Site,in accordance with the Amended Record of Decision.The off-site remedy requires “mining”of cement-stabilized“monolith”material from the previous remedy,and excavation of soil above the Remedial Action Objectives. rnThe remedy is complicated by significant involvement of stakeholders,including the City of Denver,members of the public,and elected officials,who expressed significant concerns about dust generation.As a direct result,it was determined that the remedy would be conducted under a project structure to contain dust.A“movable”3/4-acre structure was selected in lieu of a 5.5- acre structure.Technical and operational challenges of working with the project structure include:1)moving a structure across a trapezoidal-shaped property;2)meeting Uniform Building Code wind and snow loads in a high wind area and the use of ground anchors to tie down the structure;3)erection of a building on wheels;4)moving the structure across varying terrain,keeping the structure level as it moves across the remedied areas and controlling the move speed;5)maintaining indoor air quality;6)maintaining worker safety;and 7)maintaining public safety. rnThe remedy is further complicated by changing Remedial Action Objectives.The Amended Record of Decision changed(lowered)the Remedial Action Objectives for two radionuclides of concern.Compliance must be demonstrated in two locations,both of which had been remedied to the previous,less stringent standards:1)a 20 ft perimeter strip of property surrounding the Site between the monolith and the property line;and 2)up to 8 ft of vadose zone soil below the monolith.
机译:此案例研究描述了根据修正的决定记录,在沙特克化学超级基金站点实施“第二”补救措施期间遇到的技术和运营挑战以及开发的解决方案。异地补救措施要求“开采”水泥稳定的”整体材料”来自先前的补救措施,以及在“补救行动目标”之上挖掘土壤。 rn由于丹佛市,公众和民选官员等利益相关者的大量参与,他们对粉尘的产生表示了极大的关注,因此该补救措施变得非常复杂。直接结果是,该补救措施将在一个项目下进行。选择了一个“可移动的” 3/4英亩的结构来代替5.5英亩的结构。使用该项目结构的技术和操作挑战包括:1)在梯形属性上移动结构; 2)在大风区域应对统一的建筑规范的风雪荷载,并使用地锚将结构束缚在一起; 3)在建筑物上竖起建筑物; 4)在不同的地形上移动结构,保持结构水平它可以穿越修复区域并控制移动速度; 5)保持室内空气质量; 6)维护工人安全;以及7)维护公共安全。 rn通过更改补救行动目标使补救措施更加复杂。决定的修订记录更改(降低了)两个令人关注的放射性核素的补救行动目标。必须在两个位置证明遵守情况,这两个地方均已修正为先前的,不太严格的标准:1)在整块土地和地势线之间围绕场地的20英尺长的财产带;和2)在整块土地下方的8渗流带土壤。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号