【24h】

PREPARATIONS AND PLANNING FOR EPA RECERTIFICATION OF THE WASTE ISOLATION PILOT PLANT

机译:废物隔离试点工厂EPA认证的准备和计划

获取原文
获取原文并翻译 | 示例

摘要

The Waste Isolation Pilot Plant (WIPP) Recertification Project was established to meet thernrequirement of the WIPP Land Withdrawal Act (LWA)1 to demonstrate continued compliancernwith U.S. Environmental Protection Agency (EPA) disposal regulations at five-year intervals.rnThis paper delineates the objective of the first recertification effort, sets out project goals, andrnestablishes guiding assumptions. It describes the overall direction for a highly complex andrninterdependent set of tasks leading to recertification of the WIPP repository in 2004.rnThis paper also lays out a high-level schedule for producing the WIPP CompliancernRecertification Application (CRA). The major principle behind recertification is that the EPArnrecertification decision will not involve rulemaking or judicial review. To ensure that the EPA isrnable to retain this principle, the U.S. Department of Energy (DOE) will not be incorporatingrnchanges through the recertification process. Only changes previously approved by the EPA willrnbe included in the CRA. The EPA can approve significant changes to the current WIPPrnCertification through rulemaking. Non-significant changes are approved without rulemakingrnthrough the planned change reporting process [Title 40 Code of Federal Regulations (CFR),rnSection 194.4(b)].rnThe EPA WIPP Recertification Guidance2 is clear in that, if the DOE proposes significantrnchanges to the WIPP disposal system, those changes must be reviewed and approved by the EPArnprior to or following recertification, through a “planned change” process. Integral to thernrecertification effort is the concept of a “blackout period” during which the DOE will not submitrnto the EPA significant changes to the WIPP Compliance Certification. This blackout period isrnintended to allow the EPA sufficient time to act on planned change requests prior tornrecertification, anticipating that a rulemaking may be required for such allowances.rnAs planned, the DOE will provide, as part of the CRA, the results of impact, performance, andrncompliance assessments that examine the combined effects of changes made to the disposalrnsystem since the initial WIPP Compliance Certification. This assessment will be performedrnutilizing repository monitoring data and the results of any compliance-related experiments.rnCompliance areas that have not changed since the submission of the first applicationrn(Compliance Certification Application, or CCA) will be incorporated into the CRA by reference.rnThe first CRA will be precedent setting, in that any processes developed and materials submitted
机译:建立废物隔离中试工厂(WIPP)重新认证项目是为了满足WIPP土地撤回法案(LWA)1的要求,以证明每隔五年就持续遵守美国环境保护署(EPA)的处置法规。第一次重新认证工作,确定项目目标,并建立指导性假设。它描述了导致WIPP信息库在2004年重新认证的高度复杂且相互依赖的一组任务的总体方向。本文还列出了制作WIPP合规性重新认证应用程序(CRA)的高层时间表。重新认证的主要原则是EPArn重新认证决定将不涉及规则制定或司法审查。为确保EPA能够保留该原则,美国能源部(DOE)将不会通过重新认证过程来纳入更改。 CRA中将仅包括之前由EPA批准的更改。 EPA可以通过规则制定批准对当前WIPPrnCertification的重大更改。通过计划的变更报告流程批准非重大变更,无需制定规则[标题40联邦法规(CFR),rn第194.4(b)节]。rn EPA WIPP重新认证指南2明确指出,如果DOE提议对WIPP处置提出重大变更在系统中,必须在重新认证之前或之后通过“计划的更改”流程,由EPA审核并批准这些更改。重新认证工作不可或缺的是“停电期”的概念,在此期间,DOE不会向EPA提交对WIPP合规性认证的重大更改。计划该停电期是为了让EPA有足够的时间在重新认证之前对计划的变更请求采取行动,并预计可能需要对此类津贴制定规则。rn按照计划,DOE将作为CRA的一部分提供影响,绩效的结果和合规性评估,以检查自首次获得WIPP合规性认证以来对处置系统进行的更改的综合影响。该评估将通过使用存储库监视数据和任何与合规性相关的实验的结果来执行。自首次提交申请以来未发生变化的合规性领域(合规性认证申请或CCA)将通过引用并入CRA。 CRA将成为先例,因为将开发任何流程并提交材料

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号