【24h】

Ventilation planning at Minerales Monclova's Mine 7

机译:Minerales Monclova的7号矿山的通风规划

获取原文
获取原文并翻译 | 示例

摘要

Minerales Monclova, S.A. De C.V (MIMOSA) is owned by GRUPO ACERERO DEL NORTE (GAN). This company has iron and coal mines to feed it's steelmaking facilities located in the city of Monclova in the North of Mexico in the state of Coahuila. It also has coal mines to supply steam coal for two power generation stations near the border with Texas. These two stations are currently producing 8% of the country's electricity. MIMOSA has a new project in the Saltillito coal basin (Mine 7) located 40 kilometers far from the current mines. The Mine 7 project has a total amount of 30 million tonnes of recoverable coal resources and the first longwall is scheduled to start at the middle of 2006. This paper explains the ventilation planning process of the mine from the beginning in November 2001 to the current date and the future projections.
机译:Minerales Monclova,S.A. De C.V(MIMOSA)由GRUPO ACERERO DEL NORTE(GAN)拥有。该公司在Coahuila州墨西哥北部的Monclova市拥有炼铁厂供铁和煤矿使用。它还有煤矿为得克萨斯州边界附近的两个发电站提供动力煤。目前这两个电站的发电量为该国8%。 MIMOSA在距离当前矿井40公里的Saltillito煤盆地(7号矿井)中有一个新项目。 Mine 7项目的可采煤炭资源总量为3000万吨,第一座长壁井计划于2006年中开始。本文解释了该矿从2001年11月开始到现在的通风计划过程以及未来的预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号