【24h】

First Mexican coal mine recovery after a mine fire, Esmeralda Mine

机译:埃斯梅拉达(Esmeralda)矿山是墨西哥大火后的第一次墨西哥煤矿恢复

获取原文
获取原文并翻译 | 示例

摘要

On May 8,1998, a fire started in the development section of the Esmeralda Mine from methane released into the mine through a roof-bolt hole. The flames spread quickly as the coal was ignited. After eight hours, the Safety Department decided to seal the vertical ventilation shafts and the slopes. The quality of coal in the Esmeralda mine is very high quality, and MIMOSA decided to recover the facilities. However, the Esmeralda mine coals have a very high gas content of 12 m~3/ton. Immediately after the mine was sealed, MIMOSA staff implemented a plan to monitor the gas levels underground and contacted specialists for assistance in bringing the mine back on line. The entire recovery operation required seven months before the Esmeralda mine was back in operation in December 1998. Although bringing the mine back into operation was important for MIMOSA from a business standpoint, the most important thing was the recovery of the mine without any injuries to the personnel who were involved in the recovery.
机译:1998年5月8日,埃斯梅拉达(Esmeralda)矿的开发区发生了大火,甲烷是通过屋顶螺栓孔释放到矿井中的。煤被点燃时,火焰迅速蔓延。 8小时后,安全部门决定密封垂直通风井和斜坡。 Esmeralda煤矿的煤炭质量非常高,MIMOSA决定恢复这些设施。但是,埃斯梅拉达(Esmeralda)煤矿的瓦斯含量很高,为12 m3 /吨。矿井封堵后,MIMOSA员工立即实施了一项计划,以监测地下瓦斯水平,并与专家联系以寻求帮助以使矿井恢复正常运行。整个恢复操作需要在Esmeralda矿于1998年12月重新投入运营之前七个月。尽管从商业角度来说,使该矿重新投入运营对于MIMOSA很重要,但最重要的是在不造成任何伤害的情况下进行恢复参与恢复的人员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号