IRRIGATION FACILITY RELOCATIONS ALONG THE STATE ROUTE 85 CORRIDOR

机译:85号州际公路沿线的灌溉设施改建

获取原文
获取原文并翻译 | 示例

摘要

In 1999 the Arizona Department of Transportation (ADOT) began improvements alongrnthe State Route 85 (SR85) corridor between Gila Bend and Interstate 10 (I-10). At therntime SR85 was a two-lane highway that carried a large volume of truck traffic betweenrnInterstate 8 near Gila Bend and Phoenix. The SR85 roadway improvements project isrnbroken into phases. The first phase includes the construction of frontage roads and usingrnthese roads as a divided highway. Once the divided highway has been completed, thernfinal freeway cross section will be constructed between the frontage roads. The projectrnimpacted existing irrigation facilities for three irrigation districts located between the GilarnRiver and I-10, the Arlington Canal Company, Buckeye Water Conservation andrnDrainage District (BWCDD) and Roosevelt Irrigation District (RID).rnThe roadway improvements impact three main canals, turnouts from the main canal, mainrncanal check structures, delivery structures, laterals, groundwater wells and tailwaterrncollection systems. Three miles of irrigation facilities relocations were completed inrnvarious phases between 1999 and 2006. Total construction cost as of March 2008 isrnabout $9.4 million. The remaining one mile of relocations is to be completed during thernlater part of 2007 and early 2008.rnIn this paper we will present the institutional and functional constraints to infrastructurernmodernization in an urbanizing area with historic irrigated agriculture. This process wasrncomplicated by the need to continue to operate the irrigation delivery facilities on anrnalmost year-round basis.
机译:1999年,亚利桑那州交通运输部(ADOT)沿吉拉本德和10号州际公路(I-10)之间的85号州际公路(SR85)走廊开始进行改善。当时,SR85是一条两车道的高速公路,在吉拉本德(Gila Bend)附近的8号州际公路和凤凰城之间载有大量卡车。 SR85道路改善项目分为多个阶段。第一阶段包括修建临街道路,并使用这些道路作为分隔的高速公路。分割的高速公路完成后,将在临街道路之间建造最终的高速公路横截面。该项目影响了位于GilarnRiver和I-10之间的三个灌溉区,阿灵顿运河公司,Buckeye节水和排水区(BWCDD)和罗斯福灌溉区(RID)的现有灌溉设施。主要渠道,主要渠道检查结构,输送结构,支管,地下水井和尾水收集系统。在1999年至2006年的不同阶段完成了三英里的灌溉设施搬迁。截至2008年3月,总建筑成本约为940万美元。剩下的一英里的搬迁工作将在2007年下半年和2008年初完成。本文将介绍在具有历史性灌溉农业的城市化地区,基础设施现代化的制度和功能限制。由于需要在几乎全年无休的时间内继续运行灌溉设施,使这一过程变得复杂。

著录项

  • 来源
  • 会议地点 Scottsdale AZ(US)
  • 作者单位

    Stantec Consulting Inc., 8211 South 48th Street, Phoenix, Arizona 85044-rn5355 stephanie.gerlach@stantec.com;

    rnArizona Department of Transportation, 205 South 17th Avenue, Room 295E, Phoenix,rnArizona 85007 ojerez@azdot.gov;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TV212.54;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号