【24h】

INSTALLATION OF GATES ON THE SPILLWAY OF THE PUEBLO VIEJO DAM

机译:在PUEBLO VIEJO DAM溢洪道上安装门

获取原文
获取原文并翻译 | 示例

摘要

The 300 MW Pueblo Viejo - Quixal hydroelectric scheme, located in central Guatemala and completed in 1986, includes a 130 m high rockfill dam with an ungated spillway of 3 900 m~3/s maximum capacity. A severe flood occurred in 1979 during the dam construction leading to a re-evaluation of the design flood hydrograph from 1 000-years to a 10 000-years event. As part of the design modifications, it was suggested, for safety reasons, to complete all civil works according to the original design, but to postpone the installation of the radial gates on the spillway. The report presents the analyses and the characteristics of the finally adopted solution including a description of the construction details insuring an appropriate gate operation under any condition. The project mainly consists in an increase of the spillway capacity by lowering the weir crest elevation of the fixed weir combined with the installation of three 4.5 m high and 12.00 m wide radial gates equipped with concrete counterweights. The design of the spillway modification works and the selection of the hydromechanical equipment characteristics were dictated by unusually severe safety requirements. Shortly after completion, the hurricane "Mitch" affected in November 1998 the watershed of the Chixoy river, resulting in relevant floods safety discharges by the new spillway structure.
机译:300 MW位于危地马拉中部的Pueblo Viejo-Quixal水电项目于1986年完工,其中包括130 m高的堆石坝,最大容量为3 900 m〜3 / s的无孔溢洪道。大坝建设期间,1979年发生了严重的洪水,导致设计洪水水位从1000年重新评估为10000年。作为设计修改的一部分,出于安全原因,建议按照原始设计完成所有土建工程,但推迟在溢洪道上安装径向闸门。该报告介绍了最终采用的解决方案的分析和特点,包括对确保在任何条件下均能正常进行浇口操作的施工细节的描述。该项目的主要内容是通过降低固定堰的堰顶高度并结合安装三个配有混凝土配重的高4.5 m和宽12.00 m的径向闸门,来增加溢洪道流量。溢洪道改建工程的设计和液压机械设备特性的选择是由异常严格的安全要求决定的。工程完工后不久,“米奇”飓风在1998年11月影响了奇克索伊河的分水岭,新的溢洪道结构导致相关的洪水安全泄洪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号