PERFORMANCE OF THE SAINTE MARGUERITE-3 DAM DURING CONSTRUCTION AND RESERVOIR FILLING

机译:南极MARGUERITE-3大坝在施工和储层充填过程中的性能

获取原文
获取原文并翻译 | 示例

摘要

The Sainte-Marguerite-3 dam was constructed from 1996 to 1998. Reservoir filling, which started before completion of the dam, is ongoing. Behavior of the dam is monitored by instrumentation that includes some special features such as piezometers close to the downstream edge of the core and in the downstream filter, thermometers at different levels and locations in the dam, oblique photos and 3 dimensional video of the dam. After more than a year of reservoir filling, the partial head has attained more than 100 m and the dam is performing well. Deformations are less than anticipated and seepage flow is slightly more than anticipated.
机译:Sainte-Marguerite-3大坝建于1996年至1998年。在大坝建成之前就开始进行水库充填。大坝的行为通过仪器进行监控,该仪器包括一些特殊功能,例如靠近岩心下游边缘和下游过滤器的压力计,大坝中不同高度和位置的温度计,大坝的倾斜照片和3D视频。经过一年多的水库注水后,部分水头达到了100 m以上,大坝运行良好。变形小于预期,渗流略大于预期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号