The main design, construction, environmental programs and monitoring features are described for the Salto Caxias Hydroelectric Project, a 1 240 MW powerplant in operation on the Iguagu river in the State of Parana, southern Brazil. Special emphasis is given to the instrumentation supporting control and monitoring systems of the 67 m-high roller compacted concrete (RCC) dam. Salto Caxias is the second powerplant being built by COPEL with the use of RCC technique. The Jordao River diversion scheme was the first dam of COPEL with the use of this method and this experience was one of the factors for the selection of this type of dam for Salto Caxias. Salto Caxias construction began in January of 1995 and the commercial generation of the first unit was in the February 1999 - only four years of construction. After one year of operation, the monitoring system based on the vibrating wire technology permits to verify the good behaviour of the Salto Caxias RCC dam. Through the automation system of monitoring is possible in real-time to obtain the data with quickness and confidence.
机译:Salto Caxias水电项目的主要设计,施工,环境计划和监控功能均已描述,该水电站是巴西南部巴拉那州伊瓜古河上正在运行的1 240 MW电厂。 67 m高碾压混凝土(RCC)大坝的仪器仪表支持控制和监视系统受到特别重视。 Salto Caxias是COPEL使用RCC技术建造的第二个动力装置。 Jordao河导流方案是使用该方法的COPEL的第一座大坝,这一经验是为Salto Caxias选择这种类型的大坝的因素之一。 Salto Caxias的建设始于1995年1月,第一台设备的商业化生产是在1999年2月,仅进行了四年的建设。运行一年后,基于振弦技术的监控系统可以验证Salto Caxias RCC大坝的良好性能。通过自动化监控系统,可以实时,快速,可靠地获取数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号