MONTE DA ROCHA DAM ANALYSIS OF MONITORING RESULTS

机译:MONTE DA ROCHA DAM监测结果分析

获取原文
获取原文并翻译 | 示例

摘要

The results collected in the monitoring scheme of Monte da Rocha dam, a zoned earthfill 51 m in height, built between 1969 and 1970, are presented and analysed. The explanation of the causes of excessive settlements occurred in the dam and, particularly, in the neighbourhoods of the highest instrumented sections, is presented. Particular emphasis is placed on certain characteristics of the dam and the foundation, on its construction and on the installation of the embedded instruments, as they are important factors influencing the dam behaviour. Despite the first complement of the monitoring scheme has been implemented some years ago, the need of a new complement, to be implemented after the execution of corrective measures regarding the excessive settlements, aiming at following the further dam behaviour, is stressed. The monitoring results show that, so far, the settlements of the dam do not endanger the dam safety.
机译:介绍并分析了在1969年至1970年之间建造的,高度为51 m的分区填埋场Monte da Rocha大坝的监测方案中收集的结果。介绍了在大坝,特别是在仪器仪表最高的区域附近发生过度沉降的原因。由于水坝和地基是影响水坝性能的重要因素,因此特别要强调水坝和地基的某些特性,水坝的建造和嵌入式仪器的安装。尽管几年前已经实施了监测计划的第一个补充措施,但仍强调有必要在执行针对过多定居点的纠正措施之后实施新的补充措施,以期遵循大坝的进一步行为。监测结果表明,到目前为止,大坝的沉降并没有危害大坝的安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号