RISK ANALYSIS OF CONSTRUCTION DIVERSION FOR HYDRO PROJECT

机译:水利工程施工变更风险分析。

获取原文
获取原文并翻译 | 示例

摘要

In the paper, taking diversion time limit for a project as the criteria of judgement, we apply the Monte-Carlo method and the model of risk analysis CIM model to combine and superpose the risk factors of two alternative schemes of construction diversion for certain project respectively. Two alternative schemes are hereby evaluated. The computation results help to provide comparable data for the decision on design scheme; thus we can take measures in advance and draw up plans to control and reduce the occurrence of risk during construction diversion. This paper considers also there are many factors affecting the risk of river diversion during construction such as hydrologic, hydraulic and the relation between reservoir storage and stage. These factors have double uncertainty of stochastic and fuzzy. Based on both uncertainties of random and fuzzy, a risk calculation methodology of river diversion during cofferdam construction and operation is given respectively. Finally, the further studying method of risk of river diversion during construction in the future is proposed.
机译:在本文中,以工程的分流期限为判断标准,分别采用蒙特卡罗方法和风险分析CIM模型,分别对某项目的两种施工分流方案进行组合和叠加。 。因此评估了两种替代方案。计算结果有助于为设计方案的决策提供可比的数据;因此,我们可以提前采取措施并制定计划,以控制和减少施工分流期间的风险发生。本文还考虑到在施工过程中有许多因素会影响河流分流的风险,例如水文,水力以及水库存储与水位之间的关系。这些因素具有随机和模糊的双重不确定性。基于随机性和模糊性两种不确定性,分别给出了围堰施工和运营过程中引水风险计算方法。最后,提出了进一步研究今后施工中引水风险的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号