首页> 外文会议>Transportation Association of Canada conference exhibition >Coquitlam Cross-town Bike Route - Improving Bicycle Facilities in a Mature Suburban Environment
【24h】

Coquitlam Cross-town Bike Route - Improving Bicycle Facilities in a Mature Suburban Environment

机译:高贵林跨市自行车道-在成熟的郊区环境中改善自行车设施

获取原文

摘要

In May 2010, City of Coquitlam Council approved, in principle, a proposed cross-town bicycle route for implementation as part of its strategic goals of strengthening neighbourhoods and enhancing the sustainability of city services and infrastructure. The cross-town bicycle route (CTBR) is 17 km long and connects northeast Coquitlam to a multitude of destinations through southwest Coquitlam. Approximately 60 percent of the route is located on existing bicycle routes, with the remainder located on designated future routes or on low-volume local street. However, six sections were identified, primarily where the route has to cross major Arterials roads that required more analyses to address safety and improve the quality of the cyclists' experience. Challenges included: 1. transitioning between multi-use paths and on-street facilities, 2. having bike paths safely cross multi-lane arterials and on-ramps, 3. providing guidance and facilities when an on-street route makes a 90 degree turn 4. reducing conflicts where multi-use paths cross intersections, particularly channelized right turn lanes 5. placement of bollards on multi-use paths Insufficient guidance on some of these issues was provided in current standards, and practices were inconsistent even along the bike route itself. Opus conducted a cycle-through with stakeholders, reviewed geometrics and signing, and conducted a best practices review. Based on these tasks, we developed solutions including signing, pavement marking and geometric changes to best accommodate cyclists in this constrained environment. Solutions included property dedications for off-street routes, recommendations for wayfinding, 'branding' of the route, more consistent design standards, and diagrammatic directional signage at confusing transitions. A Functional Plan was prepared to recommend bike facilities, pavement marking and signage plans, cost estimates and a technical brief summarizing the findings, with associated drawings. The plan was well received by cycling advocates and will be used to identify short term improvements, long-term improvements, modifications to standards and needed dedications with redevelopment.
机译:2010年5月,高贵林市议会原则上批准了一条拟议中的跨镇自行车路线,以实施该路线,这是其加强社区和提高城市服务和基础设施可持续性的战略目标的一部分。跨镇自行车道(CTBR)长17公里,通过高贵林市西南部将高贵林市东北部连接到多个目的地。约有60%的路线位于现有的自行车路线上,其余的位于指定的未来路线或当地的小容量街道上。但是,确定了六个路段,主要是路线必须穿过主要干道,需要进行更多分析以解决安全问题并提高骑车者的体验质量。面临的挑战包括:1.在多用途道路和路内设施之间转换; 2.使自行车道安全地穿越多车道动脉和坡道; 3.当路上道路转90度时提供指导和设施4.减少多用途路径交叉的交叉处的冲突,尤其是通道右转车道5.在多用途路径上放置护柱在当前标准中,对于其中一些问题没有提供足够的指导,即使沿自行车路线本身,做法也不一致。 Opus与利益相关者进行了一个循环,审查了几何图形和签名,并进行了最佳实践审查。基于这些任务,我们开发了包括签名,路面标记和几何形状更改的解决方案,以在这种受限的环境中更好地适应骑自行车的人。解决方案包括针对街道外路线的属性专用信息,寻路建议,路线的“品牌”,更一致的设计标准以及令人困惑的过渡处的示意性方向指示牌。编制了一份功能计划,以推荐自行车设施,路面标记和标志计划,成本估算以及总结调查结果的技术简介以及相关图纸。该计划受到自行车运动拥护者的一致好评,将用于确定短期改进,长期改进,对标准的修改以及需要重新开发的奉献精神。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号