首页> 外文会议>Transmission and Substation Design and Operation Symposium >Xcel Energy AC Interference Program: Metallic Pipelines
【24h】

Xcel Energy AC Interference Program: Metallic Pipelines

机译:Xcel Energy AC干扰计划:金属管道

获取原文

摘要

Given the continued transmission build out within the SPS region, this program was tasked to investigate the potential impact to new transmission line projects sited near metallic pipelines. After more than a year of investigation, there is one clear finding: AC Interference from high voltage transmission lines onto metallic pipelines needs to be analyzed in order to be understood. With the continued construction of electrical transmission lines within the SPS region, as well as the dense existing infrastructure of the Oil & Gas industry within this same area, it is not practical for Xcel Energy to site its transmission lines to completely avoid all risk specific to AC Interference.
机译:鉴于SPS区域内持续的输电建设,该计划的任务是调查对金属管线附近新输电线路项目的潜在影响。经过一年多的调查,有一个明显的发现:为了理解交流电,需要分析高压传输线对金属管道的交流干扰。随着SPS区域内电力传输线的不断建设以及该地区内油气行业现有的密集基础设施,Xcel Energy将其传输线设置在站点中以完全避免特定于所有风险的做法不切实际。交流干扰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号