KEYNOTE ADDRESS: FRENCH PRACTICE IN THE RENOVATION OF INFORMATION AND CONTROL SYSTEMS IN 900 MW NUCLEAR POWER PLANTS

机译:主题演讲:900 MW核电厂信息和控制系统更新的法语实践

获取原文
获取原文并翻译 | 示例

摘要

From 1993 to 1995, Electricite de France carried out instrumentation and control (I&C) renovation studies. These studies were aimed at identifying those I&C components which could not be kept in operation up to the third ten-year outage and to propose adequate solutions in consequence. Both technical and economic aspects were dealt with. An observation phase gave the necessary data for decisions on obsolescence and the ageing of equipment. Basic preliminary studies were designed to propose solutions for the replacement of equipment that would not fulfil the criterion. The project concluded that most of the I&C components were in good working order and very few of them needed further study.
机译:从1993年到1995年,法国Electricite进行了仪表和控制(I&C)改造研究。这些研究旨在确定在第三个十年停运之前仍无法运行的I&C组件,并提出适当的解决方案。技术和经济方面都得到处理。观察阶段提供了必要的数据,以决定设备的过时和老化。基本的初步研究旨在提出不符合该标准的设备更换解决方案。该项目的结论是,大多数I&C组件都处于良好的工作状态,并且很少有需要进一步研究的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号