首页> 外文会议>Third Beijing International Conference on Power Transmission amp; Distribution Technology 2001; Nov 26-30, 2001; Beijing >Study on Proportion of Power Supplied Out of and within the Capital and Jing-jin tang Power Network
【24h】

Study on Proportion of Power Supplied Out of and within the Capital and Jing-jin tang Power Network

机译:京津唐电网内外供电比例研究

获取原文
获取原文并翻译 | 示例

摘要

The Capital and Jing-jin tang Power Network is the load center of North China Power Grid. The load increase is far more than that of local power generation capacity, which results in the rise of power received from out of the Capital and Jing-jin tang Power Network among the total load year after year. This paper , starting from the actual situation of North China Power Grid, focuses on the calculation of proportion of power supplied out of and within the Capital and Jing-jin tang Power Network , under the premise to ensure system security and stable operation. It provides reference for power network designing and planning department as well as operation department.
机译:首都京津塘电网是华北电网的负荷中心。负荷的增加远远超过了当地发电量的增加,导致从首都和京津塘电网接收的电力在逐年增加的总负荷中呈上升趋势。本文从华北电网的实际情况出发,在保证系统安全和稳定运行的前提下,着重计算首都京津塘电网内外的供电比例。为电网设计规划部门和运营部门提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号