首页> 外文会议>Biennial ACEEE Summer Study on Energy Efficiency in Buildings;ACEEE summer study on energy efficiency in buildings >The Utah Story: Rapid Growth of Utility Demand-Side Management Programs in the Intermountain West
【24h】

The Utah Story: Rapid Growth of Utility Demand-Side Management Programs in the Intermountain West

机译:犹他州的故事:西部山区公用事业需求侧管理程序的快速增长

获取原文
获取原文并翻译 | 示例

摘要

Two investor-owned utilities-Rocky Mountain Power (RMP), a division of PacifiCorp,rnand Questar Gas Company (QGC)-provide most of the electricity and natural gas consumed inrnUtah. Both utilities have greatly scaled up their demand-side management (DSM) programs inrnrecent years. RMP spent about 4 percent and QGC spent about 6 percent of its retail salesrnrevenue on DSM programs in 2009 (note QGC implements programs for its full service gasrncustomers only). Both utilities saved more than 1 percent of their retail energy sales from DSMrnprograms implemented in 2009 alone.rnThis paper reports on the growth in the level of energy savings and peak demandrnreduction being achieved, the funding for and key elements of electric and natural gas utilitysponsoredrnDSM programs in Utah. It describes the drivers for DSM as well as the policy andrnregulatory framework in Utah that has enabled the programs to grow. These policies includernconvenient cost recovery, decoupling of sales volume and fixed cost recovery in the case of thernQGC, and integrated resource planning. The paper also discusses how the two utilities havernworked together, in conjunction with the state of Utah to implement some programs in arncoordinated and synergistic manner. Finally, it describes the challenges that the two utilities arernfacing as they try to maintain their program budgets and high levels of energy savings goingrnforward, and how these challenges are being addressed.
机译:由PacifiCorp,rn和Questar Gas Company(QGC)的一个部门,两个由投资者拥有的公用事业公司-Rocky Mountain Power(RMP),提供了犹他州消耗的大部分电力和天然气。两家公司在最近几年都大大扩展了其需求方管理(DSM)计划。 RMP在2009年的DSM计划上花费了约4%的零售额,而QGC的支出中约有6%花费在了DSM计划上(请注意,QGC仅针对其全方位服务的客户实施计划)。两家公用事业公司仅在2009年就实施了DSMrn计划,节省了超过1%的零售能源销售。rn本文报道了节能水平的增长和正在实现的峰值需求减少,电力和天然气公用事业发起的dsm计划的资金和关键要素在犹他州。它描述了DSM的驱动程序以及犹他州的政策和监管框架,使该计划得以发展。这些政策包括:不方便的成本回收,在QGC情况下将销售量与固定成本回收分离,以及整合的资源计划。本文还讨论了这两个公用事业公司如何与犹他州一起协同工作,以协调和协同的方式实施一些计划。最后,它描述了这两家公用事业公司试图维持其计划预算和不断提高的节能水平所面临的挑战,以及如何应对这些挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号