Major Mineral Processing Equipment Costs and Preliminary Capital Cost Estimations

机译:主要矿物加工设备成本和初步资本成本估算

获取原文
获取原文并翻译 | 示例

摘要

Estimating the cost of major equipment is unnecessary when a firm price has been established by the manufacturer/supplier. However, estimating prices of equipment is important for a number of reasons discussed herein, where Cost Indices are employed to adjust from any historical base to current or future values. Capital Cost estimates, depending upon required accuracy, are grouped into three classes by the American National Standards Institute (ANSI Standard Z94.2), although five major types of fixed capital cost estimates have been recognized by the AACE in past years. Estimation via order of magnitude methods (Type 1 or Class Ⅰ) and factored or ratio methods which rely on major equipment costs and some prior information (Type 2 grading between Class Ⅰ and Ⅱ) provide rapid preliminary estimates and are discussed in some detail. Feasibility estimates (Class Ⅱ with up to 40 percent or more of engineering completed and Class Ⅲ) are discussed in another chapter (Scott and Johnston, 2002) of the Financial and Feasibility Studies section of this volume.
机译:当制造商/供应商确定价格后,不必估算主要设备的成本。但是,由于本文讨论的多种原因,估计设备价格很重要,在这些原因中,采用成本指数从任何历史基础调整为当前或未来价值。美国国家标准协会(ANSI标准Z94.2)将资本成本估算值视所需的准确性分为三类,尽管AACE在过去几年中已确认了五种主要类型的固定资本成本估算值。通过数量级方法(类型1或Ⅰ类)和因数分解法或比率法(取决于主要设备成本和一些先验信息)进行估计(Ⅰ类和Ⅱ类之间的2类分级)提供了快速的初步估计,并进行了详细讨论。在本卷的“财务和可行性研究”部分的另一章(Scott和Johnston,2002年)中讨论了可行性估算(Ⅱ级,其中已完成工程的40%或以上)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号