The Belanak FPSO Project-A Description of the Challenges in Designing andBuilding One of the Most Complex FPSOS to Date and the First To IncorporateLPG Processing and Export

机译:Belanak FPSO项目-描述设计和建造迄今为止最复杂的FPSOS以及第一个将LPG加工和出口纳入其中的挑战

获取原文
获取原文并翻译 | 示例

摘要

The Belanak FPSO was installed in the Belanak Field inrnOctober 2004 and should reach full production in the 3rdrnquarter of 2005. It will form the central production hub for arnnumber of fields in Indonesia’s West Natuna Sea area,rnincluding Belanak, Belut, Kerisi and Tawes. ConocoPhillipsrnis the operator for Block B with Inpex and ChevronTexaco asrnequity partners. Belanak has the capability to process andrnexport 350mmscfd of sales quality gas, up to 100,000 bpd ofrnstabilized crude and 23,000 bpd of LPG in separate propanernand butane streams.rnFlowlines from two 24 slot wellhead platforms transport rawrnwell fluids to the FPSO, where they are processed andrnexported as crude via a loading buoy, gas via pipelines tornMalaysia and Singapore or as LPG to a separate storage tankerrnto be moored in the Belanak Field. The Belanak facilities arerndesigned for a 30 year life and offer considerable flexibility tornaccommodate future fields and deal with incomingrnhydrocarbon streams as well as deal with H2S, CO2, Mercuryrnand Mercaptans.rnThe vessel was designed and built in Asia with projectrnmanagement and design being conducted in Singapore, thern285m hull was fabricated in China, and the topsides were builtrnand integrated in Indonesia. With approximately 25,000rntonnes of topsides process equipment which includes LPGrnfractionation as well as 1.2 million barrels of oil storage,rnBelanak is one of the most complex FPSOs built by thernindustry to date.rnThis paper will further describe the Belanak FPSO and discussrnsome of the challenges that the operator and its contractorsrnfaced in designing and delivering this production facility onrnschedule and within budget expectations.
机译:Belanak FPSO已于2004年10月安装在Belanak油田,并将于2005年第三季度全面投入生产。它将成为印度尼西亚Western Natuna海域包括belanak,Belut,Kerisi和Tawes在内的许多油田的主要生产中心。 ConpecoPhillipsrnis与Inpex和ChevronTexaco asrequity合作伙伴一起运营B区块。 Belanak有能力在独立的丙烷和丁烷流中加工和出口350mmscfd的销售优质气体,高达100,000 bpd的稳定化原油和23,000 bpd的液化石油气。来自两个24槽井口平台的输油管将生坯流体输送至FPSO,并在那里进行加工和出口。原油通过装卸浮筒,天然气通过撕裂的马来西亚和新加坡管道,或以液化石油气的形式运往另一个将要停泊在Belanak油田的储罐。 Belanak设施的设计使用寿命为30年,具有很大的灵活性,可以适应未来的油田,处理进来的碳氢化合物流以及处理H2S,CO2,Mercuryrn和Mercaptans。rn该船在亚洲设计和建造,在新加坡进行项目管理和设计,在中国制造了2.85亿船体,在印度尼西亚建造并整合了船顶。贝拉纳克拥有约25,000吨的顶部加工设备,其中包括LPG馏分以及120万桶石油,是迄今为止该行业建造的最复杂的FPSO之一。本文将进一步介绍Belanak FPSO并讨论一些挑战。运营商及其承包商在计划内和预算预期范围内设计和交付了该生产设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号