Pampo was among the first producing fields offshore in Brazil, and it produced through a fixed platform. The maturation of the field and consequent decrease in oil production required a different completion strategy for the operator. The key reservoir, the Maca?Quissam? is the prime target for exploitation because it still has substantial oil in place, with good total recovery and actual recovery factors. The development of this reservoir was vital to the survival of the field Several technical issues exist for developing this reservoir, especially during drilling, because of the high density of wells in the area. Each new well had to be carefully planned to avoid collision with existing wells and also to optimize the reservoir drainage. Several depleted wells have been evaluated to determine whether they should be abandoned and/or substituted. There were limited options for replacing these depleted wells. With collision problems at shallow depth looming as a huge risk, the number of new wells that could be drilled was low. Furthermore, the lack of rigs available for production drilling and the high slot utilization on these platforms provided additional complications. Ultimately, the development of multilateral wells was identified as the most viable solution. From the main bore, once past the critical collision zone, several legs could be drilled to increase the drainage area. Multilateral construction in this scenario is a nontrivial task. It requires the well junction to be placed at an area of high deviation, adding complexity for any intervention work. Nonetheless, the use of coiled tubing for most of the well completion operations proved to be the key enabler in this successful multilateral well development campaign. The versatility of CT technology significantly decreased the time needed for well completions and its other applications. This paper discusses the development, planning, and preparation activities involved with use of the CT in this milestone project. It summarizes the results of the development of the idea and lessons learned from the numerous runs during the completions operation, including CT-conveyed perforating; CT-conveyed logging for cement evaluation; stimulation, featuring the use of isolation tools; and several Stiffline applications.
机译:潘波(Pampo)是巴西海上最早的油气田之一,它是通过固定平台生产的。油田的成熟以及随之而来的石油产量下降,要求操作员采取不同的完井策略。关键储存库Maca?Quissam?是主要的开采目标,因为它仍然有大量的石油,总采收率和实际采收率良好。该油藏的开发对油田的生存至关重要。由于该地区高密度的井,开发该油藏存在若干技术问题,尤其是在钻井过程中。每个新井都必须仔细计划,以避免与现有井相撞,并优化储层排水。已经评估了几个枯竭的井,以确定是否应将其丢弃和/或替换。更换这些枯竭井的选择有限。由于浅层碰撞问题迫在眉睫,因此可钻的新井数量很少。此外,由于缺乏可用于生产钻探的钻机以及这些平台上的高钻槽利用率,进一步增加了复杂性。最终,多边井的开发被认为是最可行的解决方案。从主钻孔开始,一旦经过临界碰撞区,就可以钻出几条支腿以增加排水面积。在这种情况下,多边建设是一项艰巨的任务。它要求将井的交界处放置在高度偏差的区域,这增加了任何干预工作的复杂性。但是,事实证明,在大多数完井作业中使用连续油管是成功进行多边钻井开发活动的关键因素。 CT技术的多功能性显着减少了完井及其其他应用所需的时间。本文讨论了此里程碑项目中与使用CT相关的开发,计划和准备活动。它总结了该构想的开发结果,并从完井操作(包括CT输送的射孔)过程中的众多操作中汲取了教训; CT输送测井,用于水泥评估;刺激,以使用隔离工具为特色;和几个Stiffline应用程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号