Composite-Fracturing Plug Reduces Cycle-Time in a Coalbed Methane Project

机译:复合压裂塞缩短了煤层气项目的周期时间

获取原文
获取外文期刊封面目录资料

摘要

Shallow coalbed methane (CBM) projects can have multiple pay zones available for completion. Cased-hole completions allow zonal isolation to direct treatments, but re-establishing a connection to a coalseam through drilling and cementing damage may require high breakdown pressures even with an acid spearhead. Isolating individual zones to help ensure completion effectiveness is paramount to a successful completion. This paper details the use of composite epoxy-glass fracturing plugs to reduce time to complete, drill out, and clean up wells drilled in the Southern Illinois Basin (SIB) project. Over 80 wells have been completed in multiple stages using as many as three composite frac plugs to isolate four coals. Accurate placement of plugs by electric line to allow staging as close as 10 ft was accomplished without communication. These four-stage frac completions were accomplished in less than 8 hours before flowing back frac fluids from all zones. Less than a single day was required to drill out all the plugs, go to bottom, circulate clean, and prepare the wells to begin pumping. The authors compare this technique with the cost and time required to do completions with alternative isolation methods.
机译:浅层煤层气(CBM)项目可以有多个完井区。套管井完井可以将区域隔离以直接进行处理,但是通过钻孔和固井破坏来重新建立与煤层的连接,即使使用酸式矛头,也可能需要较高的击穿压力。隔离各个区域以帮助确保完成效果对成功完成至关重要。本文详细介绍了复合环氧玻璃压裂塞的使用,以减少完成,钻探和清理伊利诺伊州南部盆地(SIB)项目中钻出的井的时间。通过使用多达三个复合压裂塞来隔离四个煤,已在多个阶段完成了80口井。通过电线准确放置插头,可以在不进行通信的情况下实现接近10英尺的过渡。在从所有区域回流压裂液之前,不到四小时就完成了这些四阶段压裂完井。钻出所有堵塞物,排至底部,循环清洁并准备好井开始抽水所需的时间少于一天。作者将这种技术与用其他隔离方法完成完工所需的成本和时间进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号