Operating Experience of the Southwire High-Temperature Superconducting Cable Project

机译:Southwire高温超导电缆项目的运营经验

获取原文
获取原文并翻译 | 示例

摘要

Southwire Company of Carrollton, Georgia in cooperation with Oak Ridge National Laboratory has designed, built, installed and is operating the world's first field installation of a High Temperature Superconducting (HTS) cable system. The cables supply power to three Southwire manufacturing facilities and part of the corporate headquarters building in Carrollton, GA. The system consists of three 30-m single phase cables rated at 12.4 kV, 1250 Amps, liquid nitrogen cooling system, and the computer-based control system. The cables are built using BSCCO-2223 powder-in-tube HTS tapes and a proprietary cryogenic dielectric material called Cryoflex~(TM). The cables are fully-shielded with a second layer of HTS tapes to eliminate any external magnetic fields. The Southwire HTS cables were first energized on January 6, 2000. Since that time they have logged over 8,500 hours of operation while supplying 100% of the required customer load. To date, the cables have worked without failure and operations are continuing. The cable design has passed requisite testing for this class of conventional cables including 10x over current to 12,500 Amps and BIL testing to 110 kV. Southwire has also successfully designed and tested a cable splice. System heat loads and AC Losses have been measured and compared to calculated values. On June 1, 2001 on-site monitoring was ceased and the system was changed to unattended operation to further prove the reliability of the HTS cable system.
机译:佐治亚州卡罗尔顿的Southwire公司与橡树岭国家实验室(Oak Ridge National Laboratory)合作设计,建造,安装并正在运行世界上第一套高温超导(HTS)电缆系统的现场安装。电缆为佐治亚州卡罗尔顿的三个Southwire制造工厂和公司总部大楼的一部分供电。该系统由三根30米,额定值为12.4 kV,1250安培的单相电缆,液氮冷却系统和基于计算机的控制系统组成。电缆使用BSCCO-2223管内粉末超导带和称为CryoflexTM的专有低温电介质制成。电缆用第二层HTS胶带完全屏蔽,以消除任何外部磁场。 Southwire HTS电缆于2000年1月6日首次通电。从那时起,它们已经运行了8,500多个小时,同时为100%的客户负载提供了电力。迄今为止,电缆已正常运行,并且仍在继续运行。电缆设计已通过此类常规电缆的必要测试,包括10倍的过电流(至12,500安培)和BIL测试(至110 kV)。 Southwire还成功设计和测试了电缆接头。已测量了系统的热负荷和交流损耗,并将其与计算值进行了比较。 2001年6月1日,停止了现场监视,并将系统更改为无人值守运行,以进一步证明HTS电缆系统的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号