首页> 外文会议>Software and System Process (ICSSP), 2012 International Conference on >A reduced set of RUP roles to small software development teams
【24h】

A reduced set of RUP roles to small software development teams

机译:小型软件开发团队减少了一组RUP角色

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Software projects are always increasing their complexity. The complexity of projects arises due to the increased sophistication of software applications and of their implemented features. However, most of the projects are developed by small organizations. Since these companies have a reduced dimension, the number of individuals that constitute each software development teams will also be significantly reduced. This paper describes a Rational Unified Process (RUP) configuration composed by a reduced set of RUP roles. This configuration may easily be adopted by a small software development team during the project execution period. Additionally, we have characterized each role in this reduced model by identifying the corresponding activities in charge and by creating individual sheets detailing their responsibilities. An initial assessment of the effectiveness of this RUP configuration was performed using CMMI-DEV maturity level 2 (ML2) as a reference model.
机译:软件项目总是在增加其复杂性。项目的复杂性是由于软件应用程序及其实现的功能日益成熟而引起的。但是,大多数项目是由小型组织开发的。由于这些公司的规模减小了,构成每个软件开发团队的人员数量也将大大减少。本文描述了由一组简化的RUP角色组成的Rational Unified Process(RUP)配置。在项目执行期间,小型软件开发团队可以轻松采用此配置。此外,我们通过确定负责的活动并创建详细说明其职责的单独工作表,来表征此简化模型中的每个角色。使用CMMI-DEV成熟度级别2(ML2)作为参考模型,对该RUP配置的有效性进行了初步评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号