SELECTION, DESIGN AND CONSTRUCTION OF A RETAINING STRUCTURE TO SUPPORT THE PRIMARY CRUSHER RELOCATION PROJECT AT ROUND MOUNTAIN MINE

机译:圆形山矿主破碎机改建工程支护结构的选择,设计与施工

获取原文

摘要

The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, Nevada began large-scale production in 1977. During 2008 Round Mountain Gold Corporation (RMGC) relocated the primary crusher facility approximately 300 meters (1,000 feet) to make room for the next phase of open pit mining activities. This facility was installed in 1988 and used a log-crib retaining wall and dump pocketRMGC selected Hilfiker Retaining Walls and Collins Engineers, Inc. to provide design and materials for a new 17 meter (56 feet) high Mechanically Stabilized Embankment (MSE) wall to support the haul trucks at the new location. The construction contractor was EarthTech West Ltd. of Norwood, Colorado.An MSE wall with a cast-in-place concrete face was chosen as a durable, yet less expensive alternative to the reinforced concrete dump pocket that was originally designed for the project. The arrangement of the MSE wall is of an unusual configuration to meet a variety of operational and maintenance requirements.This paper outlines the selection process, design, and construction of the MSE wall.
机译:内华达州托诺帕以北90公里(55英里)处的朗德山金矿于1977年开始大规模生产。2008年朗德山金矿公司(RMGC)搬迁了一级破碎机工厂约300米(1,000英尺),以腾出空间用于下一阶段的露天采矿活动。该设施于1988年安装,使用了对数婴儿床挡土墙和垃圾袋。RMGC选择了Hilfiker挡土墙和Collins Engineers,Inc.为新的17米(56英尺)高的机械稳定路堤(MSE)墙提供设计和材料。在新位置支持拖运卡车。建筑承包商是科罗拉多州诺伍德市的EarthTech West Ltd.,选择了带有现浇混凝土面的MSE墙作为耐用的,但成本更低的替代品,该墙最初是为该项目设计的。 MSE墙的布置具有非常规配置,可以满足多种操作和维护要求。本文概述了MSE墙的选择过程,设计和构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号