首页> 外文会议>SME annual meeting exhibit;CMA national western mining conference >LIFE OF MINE SCHEDULE FROM MULTIPLE PITS: A CASE STUDY FOR THE TENKE FUNGURUME MINING DISTRICT
【24h】

LIFE OF MINE SCHEDULE FROM MULTIPLE PITS: A CASE STUDY FOR THE TENKE FUNGURUME MINING DISTRICT

机译:多个矿井的矿山寿命:以腾克真菌矿区为例

获取原文

摘要

This paper describes the development of a life of mine schedule (LOM) for one of the world's largest known sedimentary Copper-Cobalt districts located in the Katanga Province, Democratic Republic of Congo (DRC). A particular feature of the Tenke Fungurume LOM schedule is the considerable number of pits/phases for scheduling, each competing to provide the best ore available to a capacity constrained process facility. This paper discusses the main scheduling objectives and constraints, data pre-processing as a scheduling aid, the mine scheduling approach, and results and conclusions.
机译:本文描述了位于刚果民主共和国加丹加省的世界上最大的已知沉积铜钴矿区之一的矿山开采时间表(LOM)的发展。 Tenke Fungurume LOM日程安排的一个特殊功能是大量的矿井/阶段用于计划,每个阶段都争相提供容量有限的加工设施可用的最佳矿石。本文讨论了主要的调度目标和约束条件,作为调度辅助工具的数据预处理,矿山调度方法以及结果和结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号